100 kVA Generator for Sale and Rent in Saudi Arabia
A 100 kVA generator gives about 80 kW of real power and draws about 144 A per phase. Before comparing prices, make sure this size really matches your loads: too small and it trips, too big and it burns fuel and wears out.

Where is a 100 kVA generator used?
Commercial buildings
Lifts, cooling and lighting as backup power.
Construction sites
Welders, mixers, small cranes and site offices.
Schools and clinics
Areas that cannot lose power.
Cold stores
Protects chilled stock from spoiling.
The numbers you need before buying
| Item | Approx. value |
|---|---|
| Real power | 80 kW |
| Current at 400 V | 144 A |
| Current at 380 V | 152 A |
| ATS panel | 160 A |
| 24,000 BTU split ACs | about 24 with staggered starting |
| Diesel at 75% load | 16 litres per hour |
| Diesel at full load | 21 litres per hour |
Values are approximate and change with the model and site temperature. Compare every size in the generator kVA to amps chart.
What many buyers miss at this size
Lifts and pumps before ACs
Lift and pump motors draw several times their current on start. Give each a time delay in the transfer panel so they do not start with the ACs.
A day tank for a full shift
A base tank usually covers about 8 hours or less at medium load. For a building running 24 hours plan an extra tank and refuelling before installation.
Engines common at this size
| Brand | Engine family |
|---|---|
| Cummins | 6BT5.9 |
| Perkins | 1104 |
| Volvo Penta | TAD5 |
The engine family changes with frequency and with standby or prime rating, so we confirm the exact model in the quote.
Models close to 100 kVA
100 kVA generator questions
How many amps is a 100 kVA generator?
About 144 A per phase at 400 V and 152 A at 380 V.
How many AC units can a 100 kVA generator run?
About 31 split units of 18,000 BTU or 24 of 24,000 BTU, with staggered starting and no other large loads.
How much diesel does a 100 kVA generator use?
About 16 litres per hour at 75% load and 21 litres at full load. Light loads use less fuel, but long runs at light load harm the engine.
Can I rent a 100 kVA generator?
Yes. Silent sets on daily, weekly and monthly terms, delivered and installed in 24 to 48 hours, and on the same day for emergencies.

