A 150 kVA generator gives about 120 kW of real power and draws about 217 A per phase. Before comparing prices, make sure this size really matches your loads: too small and it trips, too big and it burns fuel and wears out.

150 kVA diesel generator by Capital Power
120kW at 0.8 power factor
217amps per phase at 400 V
24litres of diesel per hour at 75% load

Where is a 150 kVA generator used?

Commercial buildings

Lifts, cooling and lighting as backup power.

Construction sites

Welders, mixers, small cranes and site offices.

Schools and clinics

Areas that cannot lose power.

Cold stores

Protects chilled stock from spoiling.

The numbers you need before buying

ItemApprox. value
Real power120 kW
Current at 400 V217 A
Current at 380 V228 A
ATS panel250 A
24,000 BTU split ACsabout 36 with staggered starting
Diesel at 75% load24 litres per hour
Diesel at full load31 litres per hour

Values are approximate and change with the model and site temperature. Compare every size in the generator kVA to amps chart.

What many buyers miss at this size

Lifts and pumps before ACs

Lift and pump motors draw several times their current on start. Give each a time delay in the transfer panel so they do not start with the ACs.

A day tank for a full shift

A base tank usually covers about 8 hours or less at medium load. For a building running 24 hours plan an extra tank and refuelling before installation.

Engines common at this size

BrandEngine family
Cummins6CTA8.3
Perkins1106
Volvo PentaTAD5

The engine family changes with frequency and with standby or prime rating, so we confirm the exact model in the quote.

150 kVA generator questions

How many amps is a 150 kVA generator?

About 217 A per phase at 400 V and 228 A at 380 V.

How many AC units can a 150 kVA generator run?

About 47 split units of 18,000 BTU or 36 of 24,000 BTU, with staggered starting and no other large loads.

How much diesel does a 150 kVA generator use?

About 24 litres per hour at 75% load and 31 litres at full load. Light loads use less fuel, but long runs at light load harm the engine.

Can I rent a 150 kVA generator?

Yes. Silent sets on daily, weekly and monthly terms, delivered and installed in 24 to 48 hours, and on the same day for emergencies.

Need something else?

Need a 150 kVA generator?

Send the type of building, the loads and the site location, and we will suggest the right model and panel.