550 kVA Generator for Sale and Rent in Saudi Arabia

A 550 kVA generator gives about 440 kW of real power and draws about 794 A per phase. Before comparing prices, make sure this size really matches your loads: too small and it trips, too big and it burns fuel and wears out.

550 kVA diesel generator by Capital Power
440kW at 0.8 power factor
794amps per phase at 400 V
90litres of diesel per hour at 75% load

Where is a 550 kVA generator used?

Factories

Standby or prime power for production lines and compressors.

Hospitals

Critical areas fed through an automatic transfer panel.

Towers and malls

Lifts, cooling, fire and water pumps.

Large projects

Tower cranes and labour camps before grid power.

The numbers you need before buying

ItemApprox. value
Real power440 kW
Current at 400 V794 A
Current at 380 V836 A
ATS panel1000 A
24,000 BTU split ACsabout 132 with staggered starting
Diesel at 75% load90 litres per hour
Diesel at full load115 litres per hour

Values are approximate and change with the model and site temperature. Compare every size in the generator kVA to amps chart.

What many buyers miss at this size

Load test at handover

Do not accept a set this size on a no-load run. A load bank test shows cooling and governor problems before a real outage does.

One set or two?

Two half-size sets in sync give backup if one stops and save fuel at part load. They need a synchronising panel, but for hospitals and sensitive plants they are usually the better choice.

Engines common at this size

BrandEngine family
CumminsKTA19
Perkins2506
Volvo PentaTAD13

The engine family changes with frequency and with standby or prime rating, so we confirm the exact model in the quote.

550 kVA generator questions

How many amps is a 550 kVA generator?

About 794 A per phase at 400 V and 836 A at 380 V.

How many AC units can a 550 kVA generator run?

About 173 split units of 18,000 BTU or 132 of 24,000 BTU, with staggered starting and no other large loads.

How much diesel does a 550 kVA generator use?

About 90 litres per hour at 75% load and 115 litres at full load. Light loads use less fuel, but long runs at light load harm the engine.

Do you rent 550 kVA generators?

For large sizes we offer long term project rental depending on availability. At this size most clients buy with a maintenance contract.

Need something else?

Need a 550 kVA generator?

Send the type of building, the loads and the site location, and we will suggest the right model and panel.