Projects that keep running across the Kingdom

From government bodies and giga-projects to hospitals, farms and retail centres: real photos from our clients’ sites, delivered by the Capital Power team from supply and transport to commissioning and maintenance.

Moving a generator through a giga-project tunnel
+15years in the Saudi market since 2011
+500government, industrial and commercial clients
3500kVA maximum per unit
3service centres: Riyadh, Jeddah, Dammam

Government bodies, giga-projects, hospitals and industry

Filter by sector, and tap any photo to view it full size.

Government

Government projects

We delivered generator projects for government entities, where continuous power is part of the service delivered to millions of people.

ScopeSupply and installation
SectorGovernment
Government

Supply and installation for government entities

Generator supply, transport and full on-site installation. Our team handled the truck transport, the crane lift, and guiding and fixing the unit on its base until it was ready to run, with a single point of responsibility for the client.

ScopeSupply, transport, installation
StagesLift, transport, fix
Government

Housing projects

Generators delivered for housing projects with technicians on site 24 hours a day. The work included transport, lifting and installation.

On siteTechnicians 24/7
ScopeTransport, lifting, installation
Government

Round-the-clock government facilities

Maintenance of 8 Caterpillar generators at government facilities that run around the clock and cannot afford any power interruption.

Generators8 units
BrandCaterpillar
9000
kVA total capacity
9 × 1,000 kVA generators
Giga-projects

Giga-projects

Full delivery from supply to installation: 9 generators of 1,000 kVA each, 9,000 kVA in total.

Units9 generators
Rating1,000 kVA each
Total9,000 kVA
Giga-projects

Major infrastructure projects

Supply and installation of an open generator, moved inside the site by forklift through the project tunnel to its installation point, in a setting that demanded precise handling and coordination.

ScopeSupply and installation
TransportThrough the site tunnel
Healthcare

Hospital projects

Supply and installation of two generators inside a hospital generator room, 1,565 kVA in total, providing standby power during grid outages where not a second of downtime is acceptable.

Capacity1,565 kVA
TypeIndoor generator room
UseStandby power
Healthcare

Medical sector projects

Lifting and installing a generator on an elevated platform at a medical warehouse, equipping 16 medical complexes with standby generators, and supplying rental generators to hospitals.

Medical complexes16
Rental unitsFor hospitals
Food and industry

Date warehouse projects

Supply and installation of a 1,875 kVA generator for date warehouses, where the cold storage chain depends on stable, uninterrupted power.

Capacity1,875 kVA
ScopeSupply and installation
Food and industry

Poultry projects

Supply and installation of a 1,875 kVA generator for a poultry project inside a fitted generator room, protecting production from power cuts.

Capacity1,875 kVA
ScopeSupply and installation
Food and industry

Farm projects

Maintenance of 6 Caterpillar generators at farms, where power controls the entire growing environment.

Generators6 units
ScopeMaintenance
Services

Cash-in-transit projects

Supply and installation of generators for cash-in-transit companies, from delivery to commissioning on site.

Units2 generators
ScopeSupply and installation
Retail

Retail projects

Supply and installation of generators inside retail centre generator rooms, including 565 kVA units.

SectorRetail centres
RatingsUp to 565 kVA
Telecom

Telecom projects

Supply and installation of two generators inside a fenced site, with concrete bases and an electrical panel, keeping the telecom network running without interruption.

Units2 generators
WorksConcrete bases, panel
Water and fuel

Water sector projects

Supply and delivery of fuel tanks to site for water transport companies.

ScopeTank supply and transport
SectorWater
Water and fuel

Underground fuel tanks

High-capacity underground fuel tanks, fully equipped, including civil works, for safe storage that frees up space above ground.

ScopeCivil works and fit-out
TypeHigh capacity

More projects and maintenance contracts

Sectors that trust Capital Power with supply, installation and maintenance.

Nature reservesGenerator supply, installation and maintenance
Security agenciesInstallation of 4 generators
UniversitiesSupply and installation of 800 kVA
Industrial cities3 generators: 500, 650 and 800 kVA
Sports clubsTwo 1,000 kVA generators
Heritage and tourism projectsGenerator maintenance contracts
Business groupsGenerator maintenance across multiple sites
Medical and pharmaceutical warehousesStandby generator maintenance

Transport, lifting, installation and service as they really happen

Generator rooms, silent units, fuel tanks, control panels, alternator rewinding and night works: photos from our crews on site.

One team from study to maintenance

Load study

Site visit and sizing the right capacity, no more and no less.

Supply and testing

Original generators, with the option to inspect and test them before shipping.

Transport and installation

Trucks, cranes and an installation crew through to commissioning on site.

Maintenance

Scheduled maintenance contracts, a report after every visit, and 24/7 support.

Your next project deserves power that never stops

We’ll visit your site, then send a load study and a clear technical and financial offer.

Scroll to Top