Generators for Data Centres and Server Rooms
Diesel generators for data centres and server rooms with continuous ratings, paralleling and UPS compatibility, because one minute of downtime in a data centre can cost more than the generator itself.

What to put in a data centre generator spec
Continuous, not standby
Data centre ratings rely on the output a set can carry with no limit on hours. The standby figure in the catalogue is higher and not fit for comparison.
Block load acceptance
When load moves from UPS to generator it arrives almost all at once. The set must take it without a deep dip in frequency and voltage, and engines differ in this.
UPS compatibility
Modern UPS units are sensitive to frequency swings. An electronic governor and a well sized alternator keep the UPS from going to battery for no reason.
N+1 or 2N
The number of spare sets follows the availability level you need, and we design the synchronising panels around it.
Figures to have before you ask for a quote
| Item | Detail |
|---|---|
| Rating | Continuous rating written into the offer |
| Start time | Under 10 seconds to accept load |
| Fuel | Day tank and bulk tank with periodic fuel polishing |
| Testing | Load bank at handover and monthly tests on real load |
For amps and AC count per size see the kVA to amps chart.
Brands we supply
Cummins
The most requested make for factories and large projects. A wide parts network in the Kingdom keeps any downtime short. Cummins generators
Perkins
A common choice from small to large sizes and familiar to most technicians, which makes running it simpler. Perkins generators
Volvo
Fuel efficient engines in the mid range, suited to long running hours. Volvo generators
Baudouin
A wide range up to very large sizes for plant power and critical sites. Baudouin generators
John Deere
Strong engines for changing loads, pumps and agriculture. John Deere generators
Lister Petter
Small and mid sizes for work sites and smaller buildings. Lister Petter generators
From enquiry to handover
Load review
We go through the load list or power bill, find the largest motor that starts and whether the set runs standby or prime.
Specification and quote
A written offer with model, country of origin, alternator make, controller, delivery time and warranty.
Delivery and installation
Transport to site, installation, cabling and the ATS transfer panel.
Commissioning
A run on real load or a load bank, a report with readings, and training for the site team.
After handover we also offer maintenance contracts and genuine spare parts for the same make, for those who need them.
Common questions
Why is a standby rating not enough for a data centre?
Outages can be long and a standby set is built for limited hours. A continuous rating means the set carries the load however long it runs.
Do you parallel several sets?
Yes, with synchronising panels, load sharing and sets brought on by actual load.
What is the warranty?
New sets only, with a 24 month warranty.