Generators for Hospitals and Medical Centres
Supply and installation of standby generators for hospitals, medical centres and labs, with transfer in seconds, loads arranged by department priority, and a load test and full documentation at handover.

What is different about a hospital generator
Time to restore power
Healthcare standards such as NFPA 110 require power back on critical loads within 10 seconds. That decides the controller and engine start speed, and not every set achieves it.
More than one transfer panel
Theatres and ICU are one branch, life safety lighting another, HVAC and equipment a third. Each branch has its own transfer panel so a non critical load never drops a critical one.
N+1 redundancy
Two or more sets in parallel plus a spare. If one stops for service or a fault the hospital keeps its full capacity.
Imaging and UPS
MRI and CT draw sudden loads and UPS units create distortion that heats the alternator. We choose the alternator and regulator with that in mind.
Figures to have before you ask for a quote
| Item | Detail |
|---|---|
| Monthly test | Run at no less than 30 percent of rating for 30 minutes and log readings |
| Yearly test | Load bank test up to full load |
| Fuel tank | Sized for the running hours your facility class requires |
| Monitoring | Controller alarms sent to maintenance on any fault |
For amps and AC count per size see the kVA to amps chart.
Brands we supply
Cummins
The most requested make for factories and large projects. A wide parts network in the Kingdom keeps any downtime short. Cummins generators
Perkins
A common choice from small to large sizes and familiar to most technicians, which makes running it simpler. Perkins generators
Volvo
Fuel efficient engines in the mid range, suited to long running hours. Volvo generators
Baudouin
A wide range up to very large sizes for plant power and critical sites. Baudouin generators
John Deere
Strong engines for changing loads, pumps and agriculture. John Deere generators
Lister Petter
Small and mid sizes for work sites and smaller buildings. Lister Petter generators
From enquiry to handover
Load review
We go through the load list or power bill, find the largest motor that starts and whether the set runs standby or prime.
Specification and quote
A written offer with model, country of origin, alternator make, controller, delivery time and warranty.
Delivery and installation
Transport to site, installation, cabling and the ATS transfer panel.
Commissioning
A run on real load or a load bank, a report with readings, and training for the site team.
After handover we also offer maintenance contracts and genuine spare parts for the same make, for those who need them.
Common questions
Do you supply synchronising panels for hospitals?
Yes, for several sets with load sharing and shedding of lower priority loads when needed.
Do you hand over test reports?
Yes, a load test report with readings at handover and a log sheet for monthly tests.
What is the warranty?
New sets only, with a 24 month warranty.